In the March 2014 main site shutdown Gee Graphite Energised division carried out the repacking and Live Loading of 260 valve glands, plus conventional repacks on a further 100 plus valves. This work was completed inside the 21 day period allocated for valve gland repacks, we had a team of 8 technicians on site with two high pressure water packing extractors operating to remove the valve gland packing. The work was then followed up with Valve Data Sheets for each live loaded valve with all the appropriate dimensions and details for each particular valve completed. The work was carried out direct to the client in conjunction with Amec the principal contractor.
Next Article Conoco Phillips Valve Repacking
Print
1914




Gee Graphite Website Gee Valve Seals Website Live Loading Website Waterjet Cutting Website Fibre Laser Cutting

Products & Services

Gallery

Environment

Quality

Geegraf Energised

Havelock Street, Ravensthorpe
Dewsbury, West Yorkshire
WF13 3LU, ENGLAND.

  • t. +44 (0) 1924 480011
  • f. +44 (0) 1924 480017
  • e. enquiries@liveloading.co.uk
  • w. www.liveloading.co.uk
  • Contact

  • t. +44 (0) 1924 480011
  • f. +44 (0) 1924 480017
  • e. enquiries@liveloading.co.uk
  • w. www.liveloading.co.uk
  • Terms Of UsePrivacy StatementCopyright 2014 by Gee Graphite Live Loading Division